• Five Possible Solutions For the SR-710 Study


    Click for better image

    ALHAMBRA - 

    1. No Build

    2. Bus Rapid Transit from Los Angeles to Pasadena

    3. Light Rail Transit refinements from East L.A. to Pasadena

    4. A freeway tunnel connecting north and south termini of existing SR-710

    5. Transportation System Management/Transportation Demand Management

    One available option, called the BRT-6 (option two on this list), would begin near the corner of Whittier Blvd. and Olympic Blvd. and begin north, through Montebello and Monterey Park, cutting across Alhambra west of Garfield Avenue before slicing through South Pasadena and Pasadena east of Orange Grove Boulevard.

    More on this story to come.

    1 Star2 Stars3 Stars4 Stars5 Stars (No Ratings Yet)

    Loading ... Loading …

    Comments are closed

     
  • New UCLA head basketball coach Steve Alford apologized today for repeatedly defending one of his players at the University of Iowa in 2002 when the sophomore star was arrested and charged with sexual assault....
    The Gold Line Foothill Extension Construction Authority board of directors recently awarded a $48.7 million design-build contract to Webcor Builders for the intermodal parking facilities and enhancements project....
    BEAMING WITH PRIDE: Family members of the eleven 2013 Valentine Elementary School Heart of Gold honorees help recognize their loved ones’ contributions (honorees names in bold). PICTURED ABOVE, left to right, are FRONT ROW: Lauren Navarrete, Alyssa Nav...
    SAN GABRIEL VALLEY – One day before Southern Californians celebrated Earth Day, they joined together to give their cars a rest to celebrate CicLAvia. What is or was CicLAvia? It’s not just thousands upon thousands of bicyclists pedaling fro...
    Much of Southern California was under a red flag warning today — signifying what the National Weather Service calls “an extremely high fire danger” — as strong Santa Ana winds swept the region, temperatures soared and humidity l...